Kegs and bottles may need dedicated filling equipment while sharing product supply, operators or floor space. Start with the weekly order mix and note which resource limits each format. Include wash, inspection and format changes in the time available to the packaging team.
Set one workable packaging week
Record the number and size of every keg and bottle format. Assign a window to each production task and identify when both need the same person or supply. Ask an equipment vendor to mark which modules and utilities are included.
| Planning point | Kegs | Bottles |
|---|---|---|
| Good output required each week | ___ | ___ |
| Filling and cleaning window | ___ | ___ |
| Shared people and utilities | ___ | ___ |
| Empty and full package storage | ___ | ___ |
If a weekly forecast shifts 600 litres from beer kegs into 330 ml bottles, the packaging workload moves by about 1,818 bottles before any loss. Estimate time, handling and packaging stock needed for that swing. Ask which operations can share staff and which require separate equipment or scheduling.
Use the brewery packaging buying checklist to confirm what is included
Plan the equipment for both formats
Share keg types, bottle sizes, weekly volumes and the resources the systems must share.