Separate trials that can happen on the running line from tests that depend on new equipment, utilities or operators. Take baseline observations on the same package before changing the installation. Arrange the trial windows around the production commitments and fixed handovers.
Tie each test to a readiness decision
Name the sample and expected result before allocating time. Record which team can release the installation to the next stage. Keep an open item for any trial that is postponed by the works. Agree who will repeat it and on which machine.
| Trial window | What it proves | Owner and date |
|---|---|---|
| Before expansion | Existing output and sample quality | ___ |
| After mechanical installation | Transfer and format scope | ___ |
| Once utilities are available | Agreed machine and package trial | ___ |
| Before customer production | Accepted first lot and open defects | ___ |
Set an acceptance brief for brewery package quality
Scope the equipment and trials together
Share the expansion dates, package formats, current rate and planned new modules.