Packaging trials during a brewery expansion

Schedule packaging trials during a brewery expansion without losing the evidence from the existing line.

Italiano

Separate trials that can happen on the running line from tests that depend on new equipment, utilities or operators. Take baseline observations on the same package before changing the installation. Arrange the trial windows around the production commitments and fixed handovers.

Tie each test to a readiness decision

Name the sample and expected result before allocating time. Record which team can release the installation to the next stage. Keep an open item for any trial that is postponed by the works. Agree who will repeat it and on which machine.

Use the schedule alongside the brewery expansion layout.
Trial windowWhat it provesOwner and date
Before expansionExisting output and sample quality___
After mechanical installationTransfer and format scope___
Once utilities are availableAgreed machine and package trial___
Before customer productionAccepted first lot and open defects___

Set an acceptance brief for brewery package quality

Scope the equipment and trials together

Share the expansion dates, package formats, current rate and planned new modules.