A packaging shift can end with more bottles counted at the filler than at pack-out. The gap can include start-up rejects, broken glass, samples held by quality and finished bottles still on the conveyor. A useful reject register follows one unit through the process and records where each quantity actually left, so the next shift can act on what happened.
Choose the counting window
Use the same start and end times for the filler and finished-pack counters. Record the package family and recipe, and note what product was already on the line when the window opened. Count in bottles or cans throughout, converting accepted packs by the verified pack count. Keep any liquid-only loss in its own record, using the agreed measurement point and unit.
Shift reject register
| Event | Count or reading | What to record |
|---|---|---|
| Filled containers entering the window | ___ | Filler counter start and end, plus counter reset if any |
| Start-up and changeover rejects | ___ | Last good previous pack and first good new pack |
| Inspection, breakage or manual removal | ___ | First confirmed removal point and reason code |
| Quality samples or holds | ___ | How many were taken and their lot-level disposition |
| Accepted finished packs and line remainder | ___ | Pack count, bottles per pack and containers still in process |
Close the count before assigning a cause
Assume an illustrative shift starts with an empty line and the filler counts 6,000 bottles. Finished output is 480 cases of 12, or 5,760 bottles. If 120 bottles were rejected, 24 held by quality and 96 remain in process, those records reconcile to 6,000. If there is a gap, check the timing of the two counters, pack quantity and unrecorded transfer first. Keep the gap visible in the log until someone can assign it to a real event.
Beer packaging quality acceptance guide
Discuss a packaging line for your brewery
Send your container, bottle or can target per hour and where lost units are first counted. Add the asset reference when you want to discuss a specific listing.
When one reject code dominates the shift, take the affected samples and event times into a witnessed run using the brewery packaging line inspection guide.